![EXT 12_kb](http://wfora.com/wp-content/uploads/2017/03/EXT-12_kb.jpg)
WFORA has completed the design on a new annex building for the Millerton Fire Department. More
![pool_start_1](http://wfora.com/wp-content/uploads/2016/05/pool_start_1.jpg)
The Pool House began construction in the spring of 2015 with the deconstruction of the existing pool house. More
![pool_ca_5](http://wfora.com/wp-content/uploads/2016/05/pool_ca_5.jpg)
One of the distinct features of the pool house will be the structural steel roof system. More